-->
Showing posts with label shawl. Show all posts
Showing posts with label shawl. Show all posts

Wednesday, May 2, 2012

WIP Wednesday: 2012-05-02

It is May already.  Doesn't seem like it's been that long since Christmas, but isn't that the way it goes sometimes.

I started an online class on Tunisian Crochet last week.  I'll do a review on the class soon.  I've already completed 2 washcloths which I will post on Friday.  Today I'm posting my WIP from the class, the Multi Garment.  It's a sort of sampler of different tunisian stitches:



Another project that has shown some progress is my Tunisian Tee.  I've finished the 1st full body block (gosh, that's sound like a wrestling term), and am ready to start the next block.  There is a Tunisian Crochet-A-Long on this project that was scheduled to be complete a long time ago, but I don't think anyone ever finished the project.  I'm struggling with the pattern a bit and not having much luck getting help.



My Bumbleberrypie afghan is resting today.  I did manage to weave in all the ends on the completed squares and will start joining them soon.  Not sure how many more I'm going to need or if I'm going to stop doing squares and start thinking about a border.



This poor shawl that I was testing for a designer on Ravelry had to be ripped back 19 rows.  Her pattern called for 200g of fingering weight yarn, which was exactly what I had in my stash and no more.  I was about 2/3 through the LAST row when I ran out.  GRRR!  In the pic below, you see the almost finished shawl.  I've ripped back to row 30 now and am omitting row 31 in order to have enough to finish the shawl.



The shawl will come with me for my hair appointment this afternoon.  Maybe I can get a little bit done while I'm sitting under the hair dryer.  I'm getting my hair cut and COLORED.  This is unusual for me, but L commented how I ought to color the gray, so I'm going to try it.  It'll probably run all over everywhere when I ride my bike and sweat glisten until I drip.

Friday, April 20, 2012

FO Friday: 2012-04-20

Yay!  I have another finished object this week.  It is a shawl that I made to test this pattern.  It came out very pretty.  It's designed to use 1 100g skein of fingering yarn.  And it used almost exactly the whole skein.

Wednesday, April 11, 2012

WIP Wednesday: 2012-04-11

I've got several items on the hook today:


This is a shawl pattern that I am testing for the designer.  Right now I'm on hold and waiting for the designer to get back to me with some answers to a couple of questions.


This is the swatch for the beginning of a Tunisian Sock-in-the-round CAL.  This is the pattern.




 No progress on this one this week.  I'm WAY behind in making squares for the Granny-a-day CAL.



This one is still languishing.  I've folded it up and put it in the pile on the cutting table.  Don't know when I'll get motivated to work on it again.   Here's a link to the pattern for the square.


I work on this one when I go to the laundromat.  It's almost getting too big to carry with me though.  Haven't been to the laundromat yet this week, so no progress.  Pattern is from the Interweave Fall 2011 issue.








Rats!  I've run out of the yarn for this one.  It was a cone from Pisgah & Co., that I bought when the closed their factory in North Carolina.  It's Peaches & Cream 100% cotton, but it doesn't have the same texture as the cones and skeins you can get at Walmart and other big box stores.  Not use what I'll do with it.  I could re-do it in a smaller size, maybe; or re-do it and add another color; or just frog it and save the yarn for something else.  Hmmmmmm.